Thursday, September 28

And now, for something completely different.

I finished my Knitty Swap project! Yeah!

It's not that it took a long time to knit, it's just that I couldn't decide what to knit, then I couldn't find the pattern, then the yarn.... yadda yadda. Well, I finished it all last night, and I need to get in the mail ASAP. I really think I want one for myself now. Maybe I'll post pics, I think it should be safe to. We'll see.

So, that's 2 things completed this month! And, my Sizzle is almost done. It's been blocked, I just need to sew it up, then knit the neck band and sleeve edges. Should be simple, but I hate hate hate picking up stitches. Blregh.

Maybe I'll cast on for my Mom's socks instead.

Saturday, September 23

more baby photos!

Here's one of my Brother and his daughter. (wow, that's weird to say)

Thursday, September 21

Holy Carp!


I'm an auntie!

Maya Carolyn was born today at 4:04 pm. She weighed 6 pounds 13 oz. and was 19 1/2 inches long.

ignore the fact that I wear no make-up. I jumped out of the shower and ran to the hospital. I think I even forgot to put on deodorant!

But, I finished the baby sweater. It was done at 3:15, and about 45 minute later Maya was born. Pretty close! I almost didn't make it! :D

Wednesday, September 20

awww poopies.

I feel like....Well... Like my uterus is trying to escape away. Maybe run to Vegas and pursue a career as a dancer, before it decides to settle down and have some babies.
I don't know. It just hurts.

So, I called in sick, and I'm going to lay on the couch with a heating pad. Instead of cleaning. Which is what I should really be doing. Maybe when the muscle relaxers kick in.

Well, at least I should get some knitting done. I've got one sleeve left to go on the baby sweater. Sizzle is whizzing along nicely. I'm on the decrease section on the front, I think I have about 3 more to go.

Friday, September 15

Sizzle. v 1.2

So after knitting awhile on my Sizzle, I held it up, looked at it, then took it off the needles, to hold it up again. Yup. Too Big. Which is fine, I found out only 2 inches in. So I frogged it last night and starting knitting again. I made fairly good progress on it. I just placed the markers and started the first dart.

I'm holding off on knitting the sleeves on the baby sweater. I don't want it to get finished too soon. I'm not claiming to have the baby birthing powers of the Yarn Harlot, but I'm not chancing things. The wee sprout isn't due until Oct 5th, so I'm taking it easy. Plus, I think it should be born on Sept 24th. Why? I don't know. That's just the feeling I have. So. I shall finish the sweater on Sept 23rd. :D

Thursday, September 14

Yeah! New Project. :D

So I started my Sizzle last night. I finally got it to print (at work...sh!) and after measuring my boobs, and realizing that there's no way I'm a 36 inch bust, I cast on.
It's Knit Picks Andean Treasure in Wild Rose. I've been eyeing the Lagoon. It's such a lovely color. I think I may have to buy it for another one. :)

Speaking of Knit Picks. I did order some yarn. Yarn to make Hush-Hush in a lovely Red. And I got yarn to make Cleo her very own sweater. Because I've made 4 dog sweaters now, and my poor doggie goes without. So. She'll get a WOTA Cherry Red sweater. Lucky Puppy.

Tuesday, September 12

Give me a "S"

I did some swatching. I'm going to be trying another KAL with the Sexy Knitters Club. I'll be trying to do Sizzle.(love that pattern!) Following some advice from SKC, I tried some of the Andean Treasure I had on hand from a failed project from awhile back. I got the gauge with size 7 needles. Woo! So, if I ever get my printer to work, I'll print it up and get knitting. I've got a ton of projects on my plate.

Orange Baby Sweater - Just need to knit two sleeves
Knitted thing Swap - Have to get yarn. I picked out the pattern at least. :)
hubbies' Socks- I'm stuck on the heel on sock two. Not 'stuck' , just paused
Kimono Shawl - Repeat 2 done.
Baby Sweater #2- I've got the sleeves attached. Just need to work on the yoke

I think that's even in the order they much be done. Baby can come anything I guess. If she goes into labor at this point they won't stop it. The knitted thing swap has to ship by Oct 1.

Of course, the shawl can be done whenever. I'd like to get my hubbies' socks done before the first snow fall. The 2 baby sweater is a 'hope chest' project, so there's really no time limit.

Thursday, September 7

Knitting!

I screwed up! I knit two of the cutest dog sweaters and I forgot to take a picture of them. Boo!
My hubbies' aunts got a new little chihuahua and he's cold, so I knit two little hand wash wool sweaters. I used some left over lambs pride in this lovely dark green color, and the second was Wool of the Andes in leftover red and yellow.

Super Cute.
But no pictures.

I finished the front of the orange baby sweater for my bro's sprout, and am chugging along on the back.

My Kimono shawl is looking fab. I frogged back a repeat that I messed up, and that was a little scary for a moment. But I got all the stitches back on the needles, found where I was, and started knitting along again. Looking at some other ones on the interweb, I'd like to try it in a thicker weight of yarn next time. Next time! Look at me! I'm crazy! I've got enough yarn sitting around for 2 more shawls, and I have two patterns sitting around waiting for yarn for them, and I want to knit something over? Crazy.